Project: Hill & Gregory Middle Schools, Naperville, IL
Demolition of existing systems and installation of new HVAC systems over summer vacation, a 10 week schedule.
Description: Renovation of ductwork, piping, temperature controls, insulation, air and water balancing. WSM installed chiller, unit-ventilators, air-handlers and rooftop units.
Direct for Naperville School District 204
Cost: $1,300,000-$1,600,000
|
 |
Project: Buffalo Wild Wings , at South Elgin,
Oswego and North Aurora locations
Description: Installed rooftop units, fans, kitchen hoods with black iron welded duct, exposed ductwork, and temperature controls.
General Contractor: Cahill Construction
Cost: $50,000-$70,000
|
 |
Project: Bethany Lutheran Church in Naperville, IL
Description: Installed large underground PVC spiral duct at sanctuary area, various air-handlers, temperature controls, air balancing and gas piping.
General Contractor: Rekstad Builders
Cost: $500,00-$700,000
|
| |
Project: PNC Bank in Downers Grove, IL Main Mortgage Center renovation of 3 floors, 270,000 square feet of HVAC in 12 weeks.
Description: Rework existing HVAC distribution system; installation of new ductwork, VAV boxes and air balancing.
General Contractor: Jem Construction
Cost: $200,000-$300,000 |
|